On the Critical Path

On the Critical Path

On the Critical Path


(7 de 1 utilisateurs)

0h 22m 1971 HD

Voir on the critical path sur FrenchStream. Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

On the Critical Path (1971)
Tags:   #On the Critical Path 1971   #On the Critical Path film complet   #Voir   #On the Critical Path online   #On the Critical Path online FrenchStream   #On the Critical Path Film complet en ligne   #On the Critical Path films gratuits   #On the Critical Path Films gratuits   #ONF | NFB   #nuclear power   #candu

Commentaire

User

Similaire